Our final product

Date: 9th Jul 2021 @ 8:06pm

Today in DT we created our final playground structure. 

We looked back to the design we had created the previous week to recap on what piece of equipment we were going to make, what we needed our equipment to be and the materials and tools we needed to create and decorate our finished product.

We had lots of resources available to create our playground structure and we tried to use them effectively to build a strong and sturdy structure. We we're all very proud of our finished product!

After we had finished we then evaulated our design. We thought about what had gone well with our design, if it was fit for purpose and what we might change if we were to make our design again.

Contact Us

Boundary Primary School

Dinmore Ave, Blackpool FY3 7RW

School Office

01253 287250:
admin@boundary.blackpool.sch.uk

Proud to be part of the Synergy Trust

STAFF LOGIN
PARENT LOGIN